Publish Time: 2024-09-23

Project Introduction: Middle tunnel: from Tuanjie Road in the north to Nanlejiao Road in the south, with a total length of 2.4 km


South tunnel: from Nanjiao Road in the north to Wuai Interchange in the south, with a total length of 3.1 km


Purchase time May 2019


Main equipment Multi-band fiber optic repeater near and far end, POI (three-band) broadcast host, public security wireless repeater


Solution 100/350/400 Mbps pipe gallery solution



Project highlights Multi-band equipment integration

×